Regal Robotics 500 Series - Large Scale 5-Axis CNC Router
A project in Plano, TX by Donnie Weir000days
:
00hours
:
00minutes
Funding Unsuccessful
Industrial quality 10ft X 8ft X 6ft 5-Axis CNC router that is affordable enough for hobbyists and designed to fit under a 10' ceiling.
Backers: 25
Average Pledge Per Backer: $219
Funded: $5,480 of $8,000
Dates: Aug 20th -> Sep 23rd (34 days)
Project By: Donnie Weir
Backers: 25
Average Pledge Per Backer: $219
Funded: $5,480 of $8,000
Dates: Aug 20th -> Sep 23rd (34 days)
Project By: Donnie Weir
$5,480
current pledge level
Last Updated: September 23 @ 01:04 -0400 GMT
68%
of goal
(loading your very own snazzy kicktraq chart)
(loading your very own snazzy kicktraq chart)
(loading your very own snazzy kicktraq chart)
(loading your very own snazzy kicktraq chart)
(loading your very own snazzy kicktraq chart)
Now you can share!
Help your backers reach your daily goals and help others see how you're doing. It's easy, with Kicktraq Mini.Here are a few quick snippits of code you can use to embed your personalized widget on your website, in your blog, and even on your favorite forum.
HTML for websites & blogs
Copy HTMLBBCode for forums
Copy BBCodeReddit code for... well, Reddit
Copy Reddit CodeSpecial Note: Kickstarter recently disabled remote embedding for images on project pages, so embedding code doesn't work on project pages (yet) - just everywhere else.
You can read more about it here.
Latest News
Campaign is winding down
September 22nd - via: kickstarter.com
Well, we are in the final hours of the Kickstater campaign and it looks like we will be about $2600 shy of our goal. I have too much invested in this project to just let it die. If I don't reach my goal on Kickstarter, I will absolutely keep going.... (Read More)
Final 12 Hours
September 22nd - via: kickstarter.com
Well we are down to the wire and we are still short of our goal of $8000. In an attempt to regain some momentum I have decided to make a special offer to all backers of $100 or more. If we reach $8500 we will enter you in a drawing to win a Stage I... (Read More)
Detailed View of Central Assembly
September 14th - via: kickstarter.com
I have had a few people ask for a more detailed view of the Central Assembly because it's hard to make everything out in the video. This is the most complicated portion of the machine and I am almost through with this phase of the project. The... (Read More)
Telescoping Z-Axis Progress
September 4th - via: kickstarter.com
Last night I got the belts installed for the Z-Axis. These belts are what allow the telescoping portion of the Z-Axis to move while only using one screw and motor on the Z-Axis. Things are moving along smoothly at this point. If I can get my neighbor... (Read More)
Labor Day Status
September 2nd - via: kickstarter.com
Well, I didn't get quite as far as I would have liked, but I did get a lot accomplished. I drilled and tapped (threaded) over 40 holes and finished the Z-Axis belt clamps. I am an hour or two away from installing the telescoping portion of the... (Read More)
Labor Day Weekend Update
August 31st - via: kickstarter.com
I got up this morning before the sun came up and started tearing everything back down so I can install the telescoping section on the Z-Axis. The outer linear bearings are already setup, but in order to set up the inner linear bearings I have to... (Read More)
Wall of Honor is up to date
August 21st - via: kickstarter.com
This post is for backers only. Please visit Kickstarter.com and log in to read. (Read More)
If you have additional news that doesn't appear here, shoot us a link!